Deads
The plan was for 195 x 5 sets of 10
135x10,
here is where the plan started to fall apart
225x5
275x5 - this felt a little "off" so I
brought my feet in (about 3-4" apart)
315x3 - these flew up. reps were done stop and go
as my usual divebomb/touch and go would be too iffy with my hernia
340x3
2x390 - everything still flying
at this point I told myself if I had to strain at
all I'd just drop the bar
1x440 - easy, no strain
1x495 - my 20 weeks of not loading a bar messed
with my math. We were being lazy and had 25's, 10's whatever on the bar. I
pulled this and returned some smack talk to one of the guys we train with - not
so subtly reminding him that I just pulled his max, "500", after not
pulling for 20 weeks. At that point my training partner says "that was
495"! So I did what any self respecting man would do,
500x1
Press
135x5,5
155x5
Run = 1 mile
No comments:
Post a Comment